DEPLOYDatabase

Data center campus

Stargate Milam County

Stargate Milam County is a tracked AI data center campus in Texas, Milam County. Announced July 2025 alongside Dona Ana, Shackelford, Lordstown.

Announced · Stargate Infrastructure · ERCOT · Milam County, Texas, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Stargate Milam County capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

ERCOT

Grid

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
part of the ~5.5 GW cumulative capacity across the five newly announced Stargate sites
Named tenants
OpenAI
Grid operator
ERCOT

On the data center map

No mappable coordinate is recorded for Stargate Milam County yet. Location: Milam County.

In clusterTexas(606)

The deal

Power

Power source
mixed
Grid operator
ERCOT
Interconnection

The Texas (ERCOT) grid demand right now: 63.1 GW (EIA-930, 2026-08-29 15:00).

Why here

Stargate Milam County is in Texas, Milam County. It connects to the ERCOT grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Sources

cae287b9-c2de-46a0-9620-b90c63b29ae3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Stargate Milam County?
Stargate Milam County is an AI data center campus tracked on the DEPLOY registry, located in Milam County. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Stargate Milam County?
Stargate Infrastructure is recorded as a party to Stargate Milam County on the DEPLOY registry. The full party list, with each role, is on the record.
Is Stargate Milam County operating yet?
As of the most recent verification on the DEPLOY registry, Stargate Milam County is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Stargate Milam County?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Stargate Milam County on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Stargate Milam County: AI data center campus record. Retrieved August 29, 2026, from https://registry.deploy.report/datacenters/stargate-infrastructure-stargate-milam-county

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces