Data center campus
Lancium Fort Stockton Clean Campus
Lancium Fort Stockton Clean Campus is an AI data center campus developed by Lancium in Texas, Fort Stockton. 0.33 GW of capacity has been announced; 0.03 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · Lancium · greenfield · ERCOT · Fort Stockton, Texas, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2022. Energized capacity is now on record. Claimed by Lancium (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.33 GW | 2021-09-15 | reported | press release |
| Energized | 0.03 GW | 2024-06-01 | claimed | tracker |
Key facts
Lifecycle
Announced
Energized
Lancium
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Groundbreaking / 325 MW plan / first 25 MW stage (primary)
- On Sep 15, 2021, Lancium announced groundbreaking on its first Clean Campus in Fort Stockton, Texas, stating initial use would be a 100,000+ sq ft facility for Bitcoin mining and other high-throughput computing, with first 25 MW stage targeted for Q1 2022 and full capacity of 325 MW by year-end 2022 (company target at announcement; later energized MW vs that target is not restated in the CLR release) (Lancium / PR Newswire, Sep 15 2021)
- Controllable Load Resource design (primary)
- The groundbreaking release frames Clean Campuses as sited at transmission points often overwhelmed with renewable energy and enabled by Lancium Smart Response to act as Controllable Load Resources (CLRs) that can absorb renewable oversupply and provide grid reliability products usually associated with fossil plants (Lancium / PR Newswire, Sep 15 2021)
- ERCOT CLR qualification Nov 2022 (primary)
- On Nov 2, 2022, Lancium announced ERCOT had qualified the Fort Stockton Clean Campus as a Controllable Load Resource, stating CLRs can adjust load up or down within seconds as directed by ERCOT and must proportionally respond to grid needs rather than simply shutting off. The release says Lancium used Smart Response during summer 2022 peak-demand days to dynamically adjust Fort Stockton usage, and notes Lancium had previously qualified the first datacenter CLR in ERCOT in June 2020 (Lancium / PR Newswire, Nov 2 2022)
On the data center map
Every tracked data center is on this map, centered on Lancium Fort Stockton Clean Campus. Pan or zoom out to see how close rivals are building.
In clusterTexas(606)
The deal
- operator
- Lancium · Blackstone-backed (~$500M investment reported)
- utility
- ERCOT · Controllable Load Resource designation Nov 2022
- utility
- Broad Reach Power · Retail energy supplier and qualified scheduling entity (QSE) for a portion of the Fort Stockton Clean Campus; also battery-storage arrangement. Broad Reach holds a ~21 GW wind/solar/storage portfolio. Per lancium.com/2022/07/07 partnership announcement.
Power
- Power source
- grid
- Grid operator
- ERCOT
- Interconnection
- Water
- Closed-loop, non-evaporative liquid cooling that recirculates a sealed water volume; once filled it requires no additional water for the life of the project.
ERCOT grid interconnection (Controllable Load Resource), 0.33 GW grid interconnect, Partially energized. Lancium Smart Response demand-flexibility; designated CLR by ERCOT
The Texas (ERCOT) grid demand right now: 56.5 GW (EIA-930, 2026-10-02 05:00). Lancium Fort Stockton Clean Campus's announced 0.33 GW would be 0.6% of the grid's current load.
County water status: Moderate drought (D1) in Pecos County, week of 2026-09-29 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Lancium Fort Stockton Clean Campus sits on greenfield in Texas, Fort Stockton. It connects to the ERCOT grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Permanent jobs
- dozens of local high-paying jobs (company estimate, not itemized) source
Timeline
- Aug 2026party addedutility: Broad Reach Power
- Oct 2026Current: Partially energized
Sources
- Lancium Breaks Ground On First Clean Campus In Fort Stockton, Texas
- Fort Stockton Clean Campus
- Fort Stockton Clean Campus Data Center (325 MW)
- Lancium Locations · Lancium
- Lancium's Fort Stockton Facility Qualifies as ERCOT Controllable Load Resource
a91b1386-c93a-4a94-b298-767521f80726 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Lancium Fort Stockton Clean Campus?
How much power will Lancium Fort Stockton Clean Campus use?
Who is building Lancium Fort Stockton Clean Campus?
Is Lancium Fort Stockton Clean Campus operating yet?
How verified is the data on Lancium Fort Stockton Clean Campus?
Deploy Watch
Track Lancium Fort Stockton Clean Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Lancium Fort Stockton Clean Campus: AI data center campus record. Retrieved October 2, 2026, from https://registry.deploy.report/datacenters/lancium-fort-stockton-clean-campus-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/lancium-fort-stockton-clean-campus-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/lancium-fort-stockton-clean-campus-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP