DEPLOYDatabase

Data center campus

OpenAI Project Camellia (Effingham County, Georgia)

OpenAI Project Camellia is a tracked AI data center campus in Georgia, Effingham. OpenAI says it is contracting with Georgia Power Company for 3.2 gigawatts of power, delivered in phases between 2028 and 2032, for a proposed site within the Savannah Gateway Industrial Hub in Effingham County, Georgia.

Announced · OpenAI · Effingham, Georgia, United States


Capacity: announced vs energized

Announced
not recorded
Under construction
not recorded
Energized
not recorded
OpenAI Project Camellia (Effingham County, Georgia) capacity claims
Source
Contracted3.20 GW2026-07-22claimedpress release

Key facts

announced

Lifecycle

0 GW

Energized

OpenAI

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Site plan approval (reported)
Effingham County commissioners unanimously approved the roughly 1,400-acre site plan at the Nov. 17 meeting. The campus at the Savannah Gateway Industrial Hub now has six data center buildings, and OpenAI still needs more county approvals and a federal wetlands permit.

On the data center map

Every tracked data center is on this map, centered on OpenAI Project Camellia. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterGeorgia(162)

The deal

developer
OpenAI
utility
Georgia Power

Power

Interconnection

County water status: Severe drought (D2) in Effingham County, week of 2026-11-24 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

OpenAI Project Camellia is in Georgia, Effingham. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Nov 2026
    capacity changed
    contracted: unknown to 3.2
  2. Nov 2026
    Current: Announced

Sources

4f233992-a393-49f4-b925-525be97ce623 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is OpenAI Project Camellia (Effingham County, Georgia)?
OpenAI Project Camellia (Effingham County, Georgia) is an AI data center campus tracked on the DEPLOY registry, located in Effingham. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building OpenAI Project Camellia (Effingham County, Georgia)?
OpenAI is recorded as a party to OpenAI Project Camellia (Effingham County, Georgia) on the DEPLOY registry. The full party list, with each role, is on the record.
Is OpenAI Project Camellia (Effingham County, Georgia) operating yet?
As of the most recent verification on the DEPLOY registry, OpenAI Project Camellia (Effingham County, Georgia) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on OpenAI Project Camellia (Effingham County, Georgia)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track OpenAI Project Camellia (Effingham County, Georgia) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). OpenAI Project Camellia (Effingham County, Georgia): AI data center campus record. Retrieved November 28, 2026, from https://registry.deploy.report/datacenters/openai-project-camellia-effingham-county

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces