DEPLOYDatabase

Data center campus

Giga Energy Project Clay (Hunt County, Texas)

Giga Energy Project Clay is a tracked AI data center campus in Texas. Giga Energy broke ground in July on Project Clay, a 60MW GigaBase AI data center in Hunt County, Texas, which it will develop, own and operate for an undisclosed U.S.-based AI cloud provider under a 10-year lease worth a

Under construction · Giga Energy · Texas, United States


Capacity: announced vs energized

Announced
not recorded
Under construction
not recorded
Energized
not recorded
Giga Energy Project Clay (Hunt County, Texas) capacity claims
Source
Contracted0.06 GW2026-11-17claimedpress release

Key facts

0 GW

Energized

Giga Energy

Developer

On the data center map

Every tracked data center is on this map, centered on Giga Energy Project Clay. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of Giga Energy Project Clay (Hunt County, Texas)
Tenant
Undisclosed U.S.-based AI cloud provider

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterTexas(611)

The deal

developer
Giga Energy
operator
Giga Energy
tenant
Undisclosed U.S.-based AI cloud provider

Power

Interconnection
Water
Fully closed-loop cooling that operates independently of local municipal or groundwater supplies; local water use limited to sinks and employee bathrooms.

County water status: Moderate drought (D1) in Runnels County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Giga Energy Project Clay is in Texas. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

10-year lease with an undisclosed AI cloud provider
$1B press release

Regulatory paper trail

The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.

Timeline

  1. Nov 2026
    financial recorded
    lease_term: 10-year lease with an undisclosed AI cloud provider
  2. Nov 2026
    Current: Under construction

Sources

7eb8871d-2d85-4e38-858e-c85d6ba993b9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Giga Energy Project Clay (Hunt County, Texas)?
Giga Energy Project Clay (Hunt County, Texas) is an AI data center campus tracked on the DEPLOY registry, located in Texas. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Giga Energy Project Clay (Hunt County, Texas)?
Giga Energy is recorded as a party to Giga Energy Project Clay (Hunt County, Texas) on the DEPLOY registry. The full party list, with each role, is on the record.
Is Giga Energy Project Clay (Hunt County, Texas) operating yet?
As of the most recent verification on the DEPLOY registry, Giga Energy Project Clay (Hunt County, Texas) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Giga Energy Project Clay (Hunt County, Texas)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Giga Energy Project Clay (Hunt County, Texas) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Giga Energy Project Clay (Hunt County, Texas): AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/giga-energy-project-clay-hunt-county

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces