Data center campus
Giga Energy Project Clay (Hunt County, Texas)
Giga Energy Project Clay is a tracked AI data center campus in Texas. Giga Energy broke ground in July on Project Clay, a 60MW GigaBase AI data center in Hunt County, Texas, which it will develop, own and operate for an undisclosed U.S.-based AI cloud provider under a 10-year lease worth a
Capacity: announced vs energized
| Source | ||||
|---|---|---|---|---|
| Contracted | 0.06 GW | 2026-11-17 | claimed | press release |
Key facts
On the data center map
Every tracked data center is on this map, centered on Giga Energy Project Clay. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a county-level coordinate for this campus, not a verified site coordinate, so the marker shows the county rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Tenant
- Undisclosed U.S.-based AI cloud provider
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(611)
The deal
- developer
- Giga Energy
- operator
- Giga Energy
- tenant
- Undisclosed U.S.-based AI cloud provider
Power
- Interconnection
- Water
- Fully closed-loop cooling that operates independently of local municipal or groundwater supplies; local water use limited to sinks and employee bathrooms.
County water status: Moderate drought (D1) in Runnels County, week of 2026-11-17 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Giga Energy Project Clay is in Texas. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- 10-year lease with an undisclosed AI cloud provider
- $1B press release
Regulatory paper trail
The permits, filings and rules on record for this site and its jurisdiction. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026financial recordedlease_term: 10-year lease with an undisclosed AI cloud provider
- Nov 2026Current: Under construction
Sources
- Giga Energy Inks 10-Year, $1B Lease on Project Clay, a 60MW AI Data Center in Hunt County, TX · Giga Energy
- Giga Energy signs $1 billion lease for Texas AI data center with cloud provider · CNA (Reuters)
7eb8871d-2d85-4e38-858e-c85d6ba993b9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Giga Energy Project Clay (Hunt County, Texas)?
Who is building Giga Energy Project Clay (Hunt County, Texas)?
Is Giga Energy Project Clay (Hunt County, Texas) operating yet?
How verified is the data on Giga Energy Project Clay (Hunt County, Texas)?
Deploy Watch
Track Giga Energy Project Clay (Hunt County, Texas) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Giga Energy Project Clay (Hunt County, Texas): AI data center campus record. Retrieved November 20, 2026, from https://registry.deploy.report/datacenters/giga-energy-project-clay-hunt-county
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/giga-energy-project-clay-hunt-county.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/giga-energy-project-clay-hunt-county
- Data documentation: /data
- Query this programmatically: Deploy MCP